Aurora Industrial
Get a quote
Manufacturer · Exporter

Reliable Supply for Global Buyers

Certified manufacturing, documented quality control and stable lead times — for importers, distributors and project buyers.

  • ISO 9001 certified
  • Samples in 7 days
  • 15–25 day lead time
Reliable Supply for Global Buyers

Why buyers choose us

Three things that decide repeat orders in B2B supply.

QC

Documented quality

Pre-shipment inspection report with every shipment.

Sample

Fast sampling

Samples dispatched within 7 working days.

Delivery

Stable lead time

15–25 day production window with buffer capacity.

What makes this supplier different from a trading company?

Production, tooling and inspection all happen in one facility, so specifications are controlled rather than brokered.

  • 12,000 m² factory
  • 3 production lines
  • In-house tooling

Specifications

Typical values for the reference model.

Material
304 stainless steel
Tolerance
±0.02 mm
Certification
CE, ISO 9001
MOQ
100 pcs
Lead time
15–25 days

Downloads

Specifications and certificates — no form required.

  • Product catalogue

    PDF · 12 MB

    Download
  • Specification sheet

    PDF · 1.2 MB

    Download
  • Certificates (CE / ISO)

    PDF · 3.4 MB

    Download
  • Outline drawing / CAD

    DWG · 860 KB

    Download

Ready to start your order?

Send your specification — quotation within 24 hours.

Reply within 1 business day