Germany
Industrial distributor
Annual framework for Industrial Controller — 4,200 units/year on call-off, stock delivered within 10 days.
“Packing and documents matched our warehouse process exactly.”
Certified manufacturing, documented quality control and stable lead times — for importers, distributors and project buyers.
What each line holds — typical values, confirmed per order.
| Process | Tolerance / key spec | Lead time | In-house |
|---|---|---|---|
| Industrial Controller | 304 stainless steel | 15–25 days | Remote diagnostics |
| Precision Bracket | ±0.02 mm | 20–30 days | ±0.02 mm |
| Sealed Enclosure | CE, ISO 9001 | 20–30 days | IP66 rated |
One contact person follows your order through all four stages.
Send drawings or target specs — feasibility and a quote come back within 24 hours.
A pre-production sample ships for your sign-off before the batch starts.
In-process inspection with reports; third-party inspection arranged on request.
Export packing, container loading photos and complete shipping documents.
No hidden conditions — these are the terms we quote against every day.
Typical values for the reference model.
OEM / ODM supported — custom specifications quoted within 24 hours.
AN-100
Programmable controller for automated production lines.
PB-220
Machined stainless bracket, tolerance ±0.02 mm.
SE-330
IP66 enclosure for outdoor installations.
SP-100
Genuine spares and wear parts matched to the models above — packed and documented for field service.
OEM-CB
Built to your drawing or sample: material, dimensions, finish and packaging under your brand.
Recent work for distributors, OEM brands and project buyers.
Germany
Annual framework for Industrial Controller — 4,200 units/year on call-off, stock delivered within 10 days.
“Packing and documents matched our warehouse process exactly.”
USA
Co-developed Precision Bracket to their drawing — pre-production sample approved in 9 days, series in 4 weeks.
“Engineering feedback came faster than our previous supplier.”
UAE
Sealed Enclosure for a turnkey site — 3 shipments, zero delay against the contract schedule.
“Weekly progress photos made site planning simple.”
Australia
Retail-ready Industrial Controller program with barcoded cartons — 2 containers per quarter, on-time delivery 98%.
Germany
Mixed-container program across 12 SKUs including Precision Bracket — landed cost down 8% vs. previous source.
USA
Sealed Enclosure integrated into their production line — documentation passed the customer audit first time.
Specifications and certificates — no form required.
Product catalogue
PDF · 12 MB
Specification sheet
PDF · 1.2 MB
Certificates (CE / ISO)
PDF · 3.4 MB
Outline drawing / CAD
DWG · 860 KB
Send your specification — quotation within 24 hours.
Reply within 1 business day